MOOWR for Heavy Engineering & Machinery

MOOWR Scheme — Heavy Engineering & Machinery Manufacturers

Long-cycle engineering projects mean capital is locked in WIP for 9–18 months. Imported castings, hydraulics, electronics and bought-out components carry 7.5%–10% BCD and 18% IGST — paid years before the customer pays you. MOOWR breaks that cycle.

Typical imported inputs

  • Heavy castings and forgings (HSN 7325, 7326) — BCD 7.5%
  • Industrial motors, drives, VFDs (HSN 8501, 8504) — BCD 7.5%, IGST 18%
  • Hydraulic and pneumatic systems (HSN 8412, 8413) — BCD 7.5%
  • PLCs, HMIs, industrial controls (HSN 8537) — BCD 7.5%–10%
  • Bought-out sub-assemblies and gear units (HSN 8483) — BCD 7.5%

Duty profile

Project orders worth ₹500 Cr typically embed ₹150–200 Cr of imported content. MOOWR keeps the ~₹35–50 Cr duty in your business until the asset is invoiced — converting customs duty from a sunk cost into a deferred liability.

Worked example

Annual imported BoM (project + spares)₹180 Cr
Capital tooling and test rigs₹25 Cr
BCD @ 7.5% blended₹15.4 Cr
IGST @ 18%₹35.5 Cr
Total duty deferred₹50.9 Cr
Working capital cycle freed9–14 months

Why MOOWR fits Heavy Engineering & Machinery

  • Project-based revenue means lumpy cash flows — duty deferment smooths the working capital curve.
  • Spare parts business and OEM-replacement imports can move under the same licence.
  • Permits in-bond fabrication, testing and FAT (factory acceptance testing) before duty crystallises.

Case snapshot

A Pune machine tool builder serving DTA OEMs and global mining equipment majors moved imports of ₹110 Cr annually under MOOWR, deferring ~₹13 Cr in duty and aligning Customs cost recognition with revenue recognition.

FAQs

Can imported components held for 18 months in WIP remain under deferment?+

Yes. There is no shelf-life limit under MOOWR — duty crystallises only on DTA clearance of the finished good or on disposal as scrap.

Can we install imported test rigs at customer sites?+

Movement of bonded capital goods outside the licensed premises requires prior intimation and continues under bond. Site-installation is contractually feasible — we structure the licence to permit it.

Model MOOWR on your heavy engineering & machinery import basket

Send us your top-20 HSN codes, annual import volumes and DTA/export split. Receive a CFO-ready impact memo within 48 hours.